To continue on from the developments being made to the show, I have produced a new running order.
RUNNING ORDER DRAFT 3
This new running order is mostly the same as the previous one, however the opening link is 30 seconds shorter, and Round 4 is 30 seconds longer. I have updated the running total to reflect the new timings.
Below is the new running order:
Studio Production: Running Order Draft 3
Related Posts:
Professional Pre-Production: Episode Synopses DevelopmentsAfter discussing my initial episodes synopses with my tutor, he came to the conclusion that the show didn't currently have a proper story arc, or end goal, a fact I agreed with, so… Read More
Professional Pre-Production: Broadcaster Change: Netflix to Sky OneWhilst developing the show, and after discussing the show with others, I have realised that this show will not work on Netflix, and so I have decided to change the broadcaster. WH… Read More
Professional Pre-Production: Possible LocationsPleasure Park is set in a fictional seaside town. The town is called Fairwood and is in Lincolnshire (home to Skegness). Like most other seaside towns it's a little run down, and n… Read More
Professional Pre-Production: Greenlight Pitch As part of this process I had to deliver a pitch for Pleasure Park. The aim of this was to receive feedback to help develop the idea. GREENLIGHT PITCH In preparation for this … Read More
Professional Pre-Production: Character DevelopmentsFollowing on from my greenlight pitch feedback, I have updated the character profiles for Pleasure Park. CHARACTER DEVELOPMENTS The heaviest bit of feedback I received about my ch… Read More
0 comments:
Post a Comment